Image 1 12 to 12 12 roof pitch 7 12 pitch.
Roof slope formula 3 12.
X pitch 12 0 25 12 3.
Slopes greater than 18 12 are found on a frame roofs and some mansard style.
See low slope roofing.
Recalculate this value into an angle.
Lapped nonsoldered seam metal roofs with applied lap sealant must have a minimum roof slope of 1 2 12 4 slope.
The following table provides the minimum required allowable roof slope for each type of roofing material mentioned in the code.
First find the slope by finding the tangent of the degrees e g.
The pitch of your roof is 3 12.
Which is the same as saying a 45 degree slope a 12 in 12 slope or the roof will rise 12 for every 12 of horizontal run.
High pitched roofs often need extra fasteners and their pitch can be as high as 21 12.
We used this detail to calibrate our folding carpenter s rule scale for reading roof slope from the ground.
What the ahj will accept is up to them the most common answer is a registered design professional op possibly a know standard.
Use the following formula which also describes a right triangle.
Angle arctan pitch arctan 0 25 14.
Then multiply the slope by 12 to get the rise.
They have a pitch ranging from 4 12 to 9 12.
If asphalt shingles are to be installed on a low slope roof special steps are required to avoid short roof life and roof leaks.
Finally you can find the roof pitch in the form of x 12.
It is the most common way in us and canada to describe a roof s basic quality slope or steepness.
Lapped nonsoldered seam metal roofs without applied lap sealant must have a minimum roof slope of 3 12 25 slope.
If you know the angle of the roof in degrees you can find the roof pitch by converting the angle in degrees to a slope then finding the rise by multiplying the slope by 12.
It can also be written down as 25 or 14.
Roof pitch degree table.
Some sources consider low slope to include 3 12 pitch roofs.
You can also calculate roof pitch even without using a roof slope calculator.
The picture below shows the pitch of a 7 12 roof slope meaning that for 12 of horizontal measurement roof run the vertical measurement roof rise is 7.
Details of that procedure are at roof measurements.
Roof pitch is represented in inches rise of 12 inches run.
The minimum roof slope allowed by code for any type of roof is in 12 applicable only to coal tar pitch roof systems.
Low slope roofs are from 0 to 3 12 in pitch.
The pitch is expressed as inches per foot.
Pitch rise run 1 5 6 25.
Section r802 2 roof slope greater the 3 12 are coved by the span tables in sections 802.