Dampness timber infestation and an appraisal of the services are also excluded.
Roof enginer report.
We establish a roof condition index and create a prioritized plan for your roof system.
All findings in this report are based on evidence found at the subject property at the date and time of inspection.
Once the content is established the rough draft is refined for clarity and conciseness.
The drainage system was noted to collect around the rear and front of the property.
The outline defines the organization of the report and the rough draft serves to avoid omissions.
This brief report is intended to accompany the planning application to help explain the rational for the proposed development.
Although our written report will take a few days to produce we are more than happy to give you a verbal report immediately after we have finished our inspection.
It is the full intention of the engineer that these calculations conform to the international building code 2003 edition.
When the report has been finished and checked we issue it immediately by email.
Use of this report of findings shall constitute agreement by all parties involved that the inspection and report is provided on a limited liability basis the maximum liability for which the inspector engineer.
One engineer s report for a client that was used to deny an insurance claim for a church with a wind damaged roof incorrectly described a tongue in groove roof covering as plywood sheathing identified the wrong date and the wrong windstorm when he incorrectly reported low wind speeds and failed to identify and record the fact that the steeple had been lifted and moved by a 100 mph wind.
This report shall recommend appropriate remedial action where required.
Whether your roof system is a candidate for maintenance repair restoration or replacement structuretec s roof consultants and engineers can design the proper solution to ensure the watertight integrity of your roof system.
However where any discrepancies occur between these calculations and the working drawings the engineer shall.
To facilitate this in all cases we take payment prior to the engineer s inspection.
A visual survey was carried out from a tele porter and the condition of the roof noted on all elevations.
In writing a full length engineering report you should start with a report outline then proceed to a rough draft.
Roof consulting it s a widely known fact that roofs fail due to standing water improperly installed penetrations improperly installed hvac equipment improper sealing applications at seams improper deck attachments and improperly stored or damaged roof materials.
An attached garage is to the left side beneath a flat felt roof which is integral with a ground floor porch to the left side of the front elevation where a pitched and gabled roof is the front of the garage and porch area.