The cap metal or drip edge that finishes the mockup.
Roof edge termination arched.
Superior performance at the roof s edge.
If a gutter is to be installed at the roof edge first attach a spacer block made of rot resistant wood or plastic flush with the roof surface.
An aesthetic feature of the building s exterior.
Delivering systems that offer sustainability durability and longevity is the fibertite way.
Installing the metal or drip edge on the upper portion of the asphalt shingle shed style roof.
Roof edge termination with metal drip edge.
Fully adhere the membrane over the roof edge.
One of the best ways to enhance the performance of your roof membrane is proper termination at the roof s edge.
One of the first components of the roof assembly to be value engineered out of the system.
Form a 1 2 minimum radius apply termination tape remove the release paper from the tape fold the rubber over the edge press the rubber firmly.
Allow the membrane to extend past the previous roofline and nail it every four inches 4 on center.
Roof edge termination with metal drip edge first you need to fully bond the membrane over the roof ege and then allow the membrane to extend past the previous roofline and nail it every 1 219mtrs centrally.
Flat roof edge trims make sure that moisture doesn t seep into the felt and cause condensation or damp issues.
Prior to installing the metal drip edge sand the metal with sand paper.
Install using galvanized deck screws or galvanized ring shank nails every six.
Prior to installing the metal drip edge sand the metal with sand paper.
A perimeter roof edge is a termination and transition between the roof and the other building components.